Newly

Paint Inspection Kit

USD 184.20
Product description
The equipment supplied in the Paint Inspection Kit will enable on-site testing for all six stages of blast-cleaned steel and coating inspection in the following stages:

Stage 1 (ISO 8503-5 and NACE SP0287) Surface profile measurement of the blasted profile.

Stage 2 (ISO 8502-6, and ISO 8502-9) Surface cleanliness testing for soluble salts.

Stage 3 (ISO 8502-3) Surface cleanliness assessment for the quantity and size of dust particles.

Stage 4 (ISO 8502-4) Climatic conditions for the estimation of the probability of condensation.

Stage 5 (ISO 2808) Wet film measurement to ensure the correct wet film thickness has been applied.

Stage 6 (ISO 2808 and ISO 19840) Coating Thickness measurement to ensure the correct coating thickness has been applied.

You may also like

Top